Items where Subject is "624 Civil Engineering > Building and Transportation Engineering"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: Article | Monograph | Thesis
Number of items at this level: 12.

Article

Aziz, Aat Muhaiminul and Ridwan, Mochamad and Wardoyo, Tri (2023) Studi Struktur Gedung Beton Bertulang Pada Gedung RND PT Bernofarm Sidoarjo Menggunakan Metode Pushover Analysis dengan Program ETABS V.19 dan SAP2000 V.22. JURNAL TEKNIK SIPIL, 16 (1). pp. 73-86. ISSN p-ISSN: 2963-7287 e-ISSN: 2963-670

Monograph

Ghozi, Mohammad and Budiati, Anik (2024) Buku Ajar Program Aplikasi Analisis Struktur SAP 2000., ISBN:978-623-10-0671-4. Documentation. PT JEEF Legal Corpora, Surabaya.

Thesis

ARDIANSYAH, MUH. ABDILLAH (2023) PERENCANAAN ULANG STRUKTUR GEDUNG KANTOR BANK BPR JOMBANGMENGGUNAKAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS (SRPMK) DENGAN SNI 2847:2019. Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

Alfianti, Erika (2019) OPTIMALISASI WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN GEDUNG RAWAT INAP PUSKESMAS WONOAYU SIDOARJO DENGAN MENGGUNAKAN METODE CPM (Critical Path Method). Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

Budiarto, Danang Wisnu (2019) OPTIMASI PENAMPANG GEDUNG PERPUSTAKAAN UNESA DENGAN STRUKTUR BAJA MENGGUNAKAN METODE HARMONY SEARCH DAN SAP2000 BERDASARKAN SNI 1729-2015. Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

PRIBADININGSIH, KARUNIA INTAN (2023) PERENCANAAN ULANG STRUKTUR GEDUNG KANTOR PT SUMBER NUSANTARA MENGGUNAKAN BETON BERTULANG BERDASARKAN SNI 2847:2019 DAN SNI 1726:2019. Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

PUTRI, RACHMA SYAFIRA (2023) OPTIMASI DURASI PROYEK MENGGUNAKAN METODE PDM PADA PROYEK RUSUN SOMBO KOTA SURABAYA (BLOK K). Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

SUGIHARTO, SOPAN (2023) PERENCANAAN ULANG GEDUNG SEKOLAH SMPN 22 DENGAN METODE (SISTEM RANGKA PEMIKUL MOMEN MENENGAH) SRPMM. Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

SURYAWATI, ERNIA (2023) ANALISIS KINERJA PROYEK PEMBANGUNAN GEDUNG KOPERASI BERINGIN KABUPATEN BERAU DENGAN METODE EARNED VALUE ANALYSIS. Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

Setiawan, Bagus (2020) PENGARUH PENAMBAHAN KAPUR TOHOR TERHADAP NILAI CBR SUB GRADE DENGAN MENGGUNAKAN METODE ASTM D 2017. Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

Sudarwati, Dewi Oktavia (2020) Evaluasi Dan Perbaikan Kinerja Jalan Raya Terhadap Peak Hour Di Kawasan Industri (Studi Kasus Pada Jalan Raya Margomulyo, Surabaya Barat). Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

Zahro, Naila Fatimatus (2020) EVALUATION OF PHASE SETTINGS AND PLANNING ON SYNTHESE SIGNALS USING THE 2014 PEDOMAN KAPASITAS JALAN INDONESIA (PKJI) METHOD (CASE STUDY OF SIMPANG EMPAT LEGUNDI, GRESIK DISTRICT). Skripsi thesis, UNIVERSITAS BHAYANGKARA SURABAYA.

This list was generated on Fri Dec 27 11:46:42 2024 UTC.